Here is an updated picture of the 2010 Ideal Living Home at Achasta. The progress of the home has been amazing and it's almost done. Be sure to check back for the final pictures and get ready for its opening on September 11, 2010.

The cabinetrey and trim are completed on the 2010 Ideal Living Home at Achasta. Painting will also be done soon. Be sure to check back soon for more updates.



Checkout some photos of the 2010 Ideal Living Home at Achasta.
(1).jpg)
(1).jpg)
.jpg)
Checkout the building progress of the 2010 Ideal Living Home at Achasta. The first picture is a shot of the installed Icynene insulation installed throughout the house.
Be sure to check back often to see more updates on the building progress.

.jpg)
.jpg)
Checkout the building progress of the 2010 Ideal Living Home here at Achasta.


Here is a quick photo update of the building progress here at Acahsta. Plumbing and electricity have been installed. As you can see, we are moving right along with construction of the 2010 Ideal Living Home at Achasta.
.jpg)
Vertical construction of the 2010 Ideal Living Home at Achasta is complete. The roofing shingles have been installed and the home is dried in. Below are some updated pictures of the home’s construction. Be sure to check back next week for more updates.


Construction is in full swing here at Achasta. The framing and walls are up and the roof has been constructed on the 2010 Ideal Living Home at Achasta. These pictures were taken earlier this week. Be sure to check back for more updates.


We are moving right along with the house’s construction. Be sure to check back frequently to see the progress of this soon to be home and all its sustainable features.